CHARACTERISTICS
Location
: Stratonismos PBK, Chania
Period: January 2015
Duration: 14 days
Special Project Conditions: Work at heights, limited space in the fueling station.

Crete Shooting Range

Solar System for DHW Production with Vacuum Collectors

Installation of 5 solar thermal systems for the production of Domestic Hot Water to serve the personnel residing in the facilities.